Rail siding Ulack-Elga (Yakutia)

Kuznetsk Metal Constructions manufactured and started shipping the first batch of unique precast reinforced concrete sections.

These sections required for the construction of a rail road that will connect Ulack Station of Baikal-Amur Mainline with the Elga coal deposit (Yakutia).

All constructions assembled on special stands and welded on ESAB automated welding equipment. All design elements have passed the check assembly, blasting and painting in the chamber.

See the article about us in the specialized magazine Metal Supply and Sales (RUS).